Describe the concrete placement, project controls, and inspection points. Makeform turns them into a mobile pre pour inspection checklist with pass, fail, and not-applicable results, photo evidence, corrective-action details, and a clear ready-or-hold decision before the truck arrives.
Send inspection records to Slack, Google Sheets, and Zapier.
Sample prompts for the builder
Choose the placement closest to your work, adjust the prompt, or send it to the Makeform builder. Each example is a practical starting structure to review against the project documents.
Prompt ready4 formats
Audience
Superintendents checking a commercial slab before placement
Format
Sectioned field checklist with failed-item follow-up
Prompt size
536 chars
Brief qualitySends to builder
Example checklist structure
Sectioned field checklist with failed-item follow-up
Prompt exampleEditable in builder
Project, pour area, drawing revision, and mix
Short answerFirst ask
2
Subgrade, barrier, forms, dimensions, and elevations
Multiple choice
3
Reinforcement, cover, embeds, sleeves, and joints
Multiple choice
4
Describe and photograph failed items
File upload
5
Ready to pour or hold?
Multiple choice
Suggested routing tags
Suggested
Ready to pour
Correction required
On hold
Give each inspection point its own pass, fail, or not-applicable result. A single overall approval box can hide the exact correction that is still open.
Step 1
Identify
project, pour area, revision, mix, and schedule
Step 2
Inspect
forms, rebar, embeds, access, and coordination
Step 3
Correct
failed items get an owner, evidence, and recheck
Step 4
Release
record ready-to-pour or hold status
Field records that support a clear decision
Know what passed before concrete covers it.
A useful pre-pour record connects each inspection point to the exact placement area, exposes unresolved work, and shows the final decision that site teams received.
One status per inspection point
Record pass, fail, or not applicable separately for formwork, reinforcement, embeds, access, testing, and other project-specific items instead of burying the result in one overall checkbox.
Failed items open follow-up fields
Conditional questions request the precise location, observation, photo, responsible party, planned correction, and reinspection result only when a problem is selected.
Readiness has a visible handoff
Finish every submission with ready to pour or hold, plus the person recording the decision, time, comments, and notification recipients your project uses.
Adapt it to the placement
Different pours need different inspection routes.
Start with the concrete element your team is preparing, then replace sample labels with the locations, drawing references, terminology, and release path used on the project.
Slabs on grade
Cover subgrade, vapor barrier, form elevations, reinforcement, joints, sleeves, embeds, access, mix details, finishing plan, and weather preparations.
Walls and columns
Organize form condition, bracing references, line and plumb, rebar, cover, blockouts, waterstops, anchors, plates, openings, and placement access by element ID.
Footings and grade beams
Record excavation and bearing condition, water or debris, dimensions, rebar, dowels, cover, anchor templates, sleeves, grounding items, and delivery access.
Name the element, area, sequence, responsible roles, planned placement time, mix reference, applicable drawing revisions, and the formwork, reinforcement, embed, logistics, and coordination checks your project requires.
02
Edit items around the site walk
Arrange sections in the order an inspector sees them. Split combined checks, add not-applicable choices, require critical identifiers, and use the same grid, elevation, element, and status language crews use in the field.
03
Configure failures and reinspections
When an item fails, reveal location, observation, photo, assigned owner, target correction time, action taken, and reinspection result. Keep an unresolved failure visible in the final readiness decision.
04
Test the handoff before the pour
Submit one passing example and one failed example from a phone. Check required fields, image readability, timestamps, final status, and whether the right superintendent, inspector, subcontractor, and testing contact receive the record.
Choose the right record
Compare common pre-pour documentation methods.
The best format is the one your site team can complete, review, correct, and retrieve before placement begins.
Approach
What it records
Where it fits
ApproachPaper checklist
What it recordsHandwritten marks and signatures, with photos and corrections often stored separately.
Where it fitsA familiar backup when someone can distribute, scan, and retain the completed sheet.
ApproachGeneric digital form
What it recordsSearchable responses, but broad checks may omit pour locations, revisions, embeds, and reinspection logic.
Where it fitsA shared inspection process where placement-specific detail is minimal.
Approach
Generated pre-pour checklist
What it recordsPour identity, item-level results, conditional evidence, assigned corrections, reinspection, and final status in one submission.
Where it fitsRepeatable site checks tailored to the element, project terminology, and notification route.
Field guide
Six sections for a practical pre-pour inspection checklist.
Use these sections as an editing guide. Match the final checklist to the drawings, specifications, inspection plan, responsibilities, and release process established for the project.
Pour identity
Tie the record to one placement area.
Capture the project, date and time, building or structure, level, grid lines, element IDs, pour number, sequence, inspector, contractor, planned volume, mix reference, scheduled start, and drawing or submittal revisions reviewed.
Use controlled location choices when crews repeat similar pours.
Record revision identifiers rather than a vague drawings reviewed box.
Include weather and site conditions that affect preparation decisions.
Base and formwork
Check what establishes shape and support.
For the element being placed, include bearing or subgrade condition, blinding or vapor barrier, form dimensions, line, elevation, plumb, cleanliness, joints, chamfers, blockouts, release agent, bracing references, openings, and leakage points as applicable.
Phrase each result around an observable condition.
Attach overview photos where location context matters.
Provide not-applicable options for checks outside the selected element.
Reinforcement
Record rebar, supports, laps, and cover separately.
Identify bar size, spacing, quantity, placement, laps, couplers, dowels, chairs, ties, and cover checks relevant to the drawings. Separate major zones so one passing response does not conceal an isolated issue at an edge, opening, or congestion point.
Use grid, elevation, or element labels for precise locations.
Keep field measurements beside the related result.
Route displaced or incomplete reinforcement through the failure branch.
Embeds and interfaces
Coordinate items that disappear into the concrete.
List anchor bolts, plates, inserts, sleeves, conduits, boxes, drains, waterstops, keyways, grounding components, openings, and other trade items expected in the placement. Ask for trade confirmation only where your project process calls for it.
Group items by trade or location to speed the walk.
Capture survey or layout references when alignment is important.
Require a photo and owner when an expected item is missing.
Logistics and readiness
Check that placement support is arranged.
Add the truck route, pump location, hose or bucket path, access, lighting, washout, communication method, crew, finishing equipment, backup plan, weather preparations, sampling location, and testing contact that need confirmation before placement starts.
Keep logistics checks distinct from constructed-work results.
Name the responsible role for each unresolved coordination item.
Use the final status to show whether an open item prevents the pour.
Correction and release
End with evidence, ownership, and status.
Every failed check should identify the item, exact location, observation, photo, owner, correction, and reinspection outcome. Finish with the ready-to-pour or hold decision, decision time, person recording it, comments, and recipients required by the project workflow.
Do not let a general note replace item-level failure details.
Keep the original result visible after a correction is recorded.
Send the final status to named roles or a defined project channel.
Related tools
Connect pre-pour checks to site follow-up.
Build companion forms for foundations, excavation, safety, equipment, progress, and observations while keeping the pre-pour record focused on placement readiness.
Practical answers for construction supervisors and inspectors moving placement-readiness checks from paper to a digital form.
What should a pre pour inspection checklist include?
Start with project, location, pour number, element IDs, date, inspector, scheduled time, mix reference, and drawing revisions. Add item-level results for the base or subgrade, formwork, dimensions and elevations, reinforcement, cover, embeds, openings, joints, access, logistics, weather preparations, and testing coordination as relevant. Failed items should collect a location, note, photo, owner, correction, and reinspection result. End with an explicit ready-to-pour or hold status.
Can I use different checklists for slabs, walls, and footings?
Yes. Generate separate forms for distinct placement types or branch from an element selection. Slabs may emphasize subgrade, vapor barrier, elevations, joints, and finishing logistics. Walls and columns may emphasize line, plumb, bracing references, waterstops, ties, blockouts, and embeds. Footings may emphasize bearing condition, excavation dimensions, water, mud, dowels, anchors, and grounding items. Separate forms are easier when the inspection routes differ substantially.
How should the checklist handle a failed inspection item?
Use conditional logic so fail reveals required fields for the exact location, observation, photo, responsible party, planned correction, correction time, and reinspection result. Preserve the original failure rather than overwriting it with pass. The final section should show whether the open item places the pour on hold, using the status terms and decision roles established for your project.
Can inspectors complete the checklist on a phone?
Yes. Publish the form as a link that inspectors can open on a phone or tablet. Keep labels concise, group checks in the order of the site walk, use consistent pass, fail, and not-applicable choices, and reveal detailed fields only after a failed result. Test a clean submission and a correction scenario on the devices used in the field, including photo upload and notification behavior.
Can the form collect photos and trade confirmations?
Yes. Add file-upload fields for overall context, concealed items, and failures. Pair photos with location and description fields so the image remains interpretable later. You can also add named confirmations for the roles or trades involved in your own coordination process. Keep those confirmations specific to the project workflow and avoid turning one generic sign-off into a substitute for item-level checks.
Is the pre pour inspection checklist generator free?
Yes. Makeform supports unlimited free forms and responses, so you can generate, edit, publish, and collect pre-pour inspection submissions without a response cap. The paid tier removes the Makeform badge. Review the generated checklist against the current project documents and replace sample wording with the inspection points, decision roles, status choices, and routing rules your team uses before deploying it.
Where do completed pre-pour inspection records go?
Submissions are collected in Makeform with results, comments, status, timestamps, and uploaded files together. You can send data to Google Sheets, notify a Slack channel, or connect workflows through Zapier. Choose destinations based on who reviews normal results, who must see failures, how pour and location IDs will be searched, and how correction evidence will be linked to the original inspection.
Does a generated checklist replace the project inspection plan?
No. The generator helps structure the requirements you provide; it does not determine the correct inspection scope or authorize concrete placement. Build the form from the current drawings, specifications, submittals, inspection plan, and responsibilities applicable to the project. Have the contents reviewed by the people responsible for the work, and update the form when the design, sequence, placement method, or project process changes.
Make every placement decision clear.
Generate a pre-pour checklist inspectors can complete at the work area.
Unlimited free forms and responsesConditional failure details and photosClear ready-to-pour or hold handoff