Inspection identity
Define the record before the checklist begins.
Tie every submission to the job, exact area, stage, people, and governing references.
- Address, building, floor, room, equipment, and circuit.
- Inspector, contractor, client, date, and stage.
- Permit, drawing revision, work order, and inspector-selected code edition.