Free change order request form builder

Free Change Order Request Form Generator

Describe your project and how changes get approved. Makeform turns it into a change order request form — scope of work description, itemized cost breakdown, schedule impact, and signature fields — so every change to the contract is priced and approved in writing before the work happens.

Chat input for the Makeform, best AI form builder. Press Enter to submit your request and generate a form. Use Shift+Enter to add a new line.
  • Free first draft
  • Editable before publish
  • Cost breakdown and signature fields
  • Works for GCs, subcontractors, and remodelers
Explore form features
31129+ makers build faster
Used by tools like ChatGPT, Perplexity & Claude

Send change order requests to Slack, Google Sheets, and Zapier.

Sample prompts for the builder

Pick a prompt, edit it above, or send it into the real Makeform builder. The structure here is an example, not a live AI result.

Prompt ready

Audience

General contractors submitting changes to the project owner

Format

Full change order request with cost and schedule impact

Prompt size

607 chars

Brief qualitySends to builder

Example form structure

Full change order request with cost and schedule impact

Prompt exampleEditable in builder

Project name and contract number

Short answerFirst ask
2

Describe the change to the scope of work

Short answer
3

Reason for the change

Dropdown
4

Cost breakdown: labor, materials, equipment, markup

Number
5

Schedule impact in days

Number
6

Supporting drawings and specifications

File upload
7

Contractor and owner sign-off

Signature

Suggested routing tags

Suggested

Pending review

Approved

Revise and resubmit

Make the cost breakdown and schedule impact required fields — a change order request without a price is just a conversation.

Step 1

Request

scope change described, priced, and dated

Step 2

Review

owner or GC checks cost and schedule impact

Step 3

Approve

signatures recorded before work proceeds

Step 4

Update

contract sum and completion date adjusted, log current

Why a request form

Change orders fail on email threads and verbal OKs.

On most projects the scope change is real, the extra cost is real — and the paper trail is a text message. A change order request form makes every change priced, documented, and signed before the crew touches it.

Verbal approvals become unpaid work

"Go ahead, we'll sort it out" is how contractors eat the cost of extra work. A signed change order request is how they get paid for it.

Lump-sum numbers get disputed

A single "$8,400 extra" invites pushback. An itemized breakdown — labor, materials, equipment, markup — gets reviewed and approved.

Without a log, the contract value drifts

Ten undocumented changes later, nobody can explain the gap between the original contract sum and the final invoice. A change order log can.

Built for how changes flow

One form pattern, four ways changes actually happen.

Start from the version closest to who submits changes on your projects, then edit the fields in the builder.

Contractor to owner

The formal change order request — scope description, cost breakdown, schedule impact, and both signatures on one record.

Subcontractor to GC

Trades submit itemized pricing for out-of-scope work, with photos of field conditions attached to the request.

Remodeler to homeowner

Plain-language change descriptions with the new project total, approved or declined with a signature from the client's phone.

Field crew T&M tickets

Same-day time-and-materials records with photos — the evidence that backs the formal change order request later.

Change order workflow

From site condition to signed approval, on the record.

Makeform turns your change process into a live form with notifications, so requests stop living in email threads and job-site texts.

Explore form features
01

Describe your project and process

Tell Makeform who submits changes, what has to be priced, and who approves — it drafts the change order request form with the right fields.

02

Edit the generated form

Adjust cost fields for lump-sum or unit-price contracts, add conditional logic — time-extension questions only when the schedule is affected — and mark the breakdown required.

03

Route it for review and approval

Each request emails the owner, PM, or architect and can post to Slack, so pricing gets reviewed before anyone commits to the work.

04

Keep the change order log current

Submissions flow to your inbox and Google Sheets — one running log of every change, its cost, its status, and the cumulative contract value.

Form vs template vs email thread

Why a generated form beats a downloaded change order template.

A change order template gives you a document to re-fill by hand on every project. A generated form is already yours — subs and clients submit online, and every request files itself.

Approach
What happens
Best read
ApproachEmail thread or verbal OK
What happensThe work happens, the price is discussed later, and someone eats the difference.
Best readFine until the first dispute — then it's your word against theirs.
ApproachDownloaded template (PDF / Word / Excel)
What happensYou get the wording and a cost grid, then re-fill it per project and chase signatures on printouts.
Best readUseful for the document format — the tracking and approval problem stays unsolved.
Approach
Generated online form
What happensSubs and clients submit priced requests with attachments, sign on screen, and the log updates itself.
Best readItemized costs, recorded approvals, one searchable change order log.

Field guide

What a change order request form should include.

Looking for a change order request template? These are the sections that make one work on a real project — generate them as a form, then adapt the wording to your contract.

Contract & identification

Tie the change to the contract.

A change order only means something relative to the contract it changes. Reference the original agreement precisely, and number every request so the log stays auditable.

  • Project name, location, and contract number.
  • Sequential change order number and request date.
  • Parties: owner, general contractor, architect or engineer, and who is requesting.

Scope & justification

Say exactly what changes, and why.

Vague descriptions are where disputes start. Describe the addition, deletion, or modification to the scope of work in specific terms, and record the cause — it drives who pays.

  • Description of the change to the scope of work.
  • Reason category: owner request, design change, unforeseen conditions, code requirement.
  • Referenced drawings, specifications, and photo or document attachments.

Cost breakdown

Price it so it can be approved.

Reviewers approve itemized numbers and dispute round ones. Break the price into labor, materials, equipment, and markup, and show what the contract is worth after the change.

  • Labor hours and rates — regular and overtime — materials with quantities, equipment.
  • Subcontractor costs, overhead, and markup percentage.
  • Original contract sum, previously approved change orders, this change, new contract total.

Schedule & approvals

Get the time and the signatures on record.

Cost is only half the impact — extra work moves the completion date. State the time extension explicitly and close with signature lines for everyone whose approval the contract requires.

  • Schedule impact in days and the revised completion date.
  • Approval decision: approved, approved as noted, or revise and resubmit.
  • Signature and date fields for owner, contractor, and architect or engineer.

Related tools

Cover the rest of the project paperwork.

The change order is one document in the chain. Build the work orders, progress reports, and prequalification forms for the same projects from one AI builder.

Explore all AI tools

AI Construction Work Order Form Generator

Dispatch and document the work itself — the order the change order amends.

Open tool

AI Change Request Form Generator

The generic change request pattern for IT, operations, and service teams.

Open tool

AI Work Order Request Form Generator

Let clients and staff request new work before it becomes an order.

Open tool

AI Construction Progress Report Generator

Weekly site progress, photos, and blockers — the context behind every change.

Open tool

AI Subcontractor Prequalification Form Generator

Qualify the trades before they're the ones submitting change orders.

Open tool

AI Construction Bid Request Form Generator

Collect bids to join your projects — scope, pricing, and documents in one place.

Open tool

FAQ

Change order request form questions

Short answers for contractors, PMs, and remodelers replacing email-thread change management.

What is a change order request form?

It is the document used to propose and approve a modification to an agreed scope of work — most commonly on construction projects. It records what is changing and why, the cost adjustment to the original contract sum, the schedule impact, and the signatures of the owner, contractor, and other approving parties. Once approved, it becomes part of the contract.

How do you write a change order request?

Reference the original contract (project name, contract number, date), give the request a sequential change order number, and describe the change to the scope of work in specific terms. Itemize the cost impact — labor, materials, equipment, markup — state the schedule impact in days, attach supporting drawings or photos, and end with signature lines for every party who must approve. The generator builds all of these fields into your form automatically.

What is the purpose of a change order request?

To formalize changes before the work happens. A written request documents exactly what will change, what it costs, and how it affects the completion date — so the owner keeps budget control, the contractor gets paid for extra work, and neither side ends up disputing verbal instructions. The approved log also explains the gap between the original contract sum and the final cost.

What is the difference between a change order and a change request?

A change request is the generic pattern — any proposal to alter agreed work, common in IT and service projects. A change order is the construction-contract version: it carries pricing and schedule impact and, once signed, formally amends the contract. If you need the generic version, use our change request form generator instead.

What is the difference between a change order form and a work order?

A work order authorizes and dispatches the work itself. A change order modifies work that is already under contract — different scope, different price, or different schedule than originally agreed. On many projects an approved change order results in a new work order for the crew.

What fields should a change order request form include?

The core set: project and contract identification, a sequential change order number, description of the change to the scope of work, reason for the change, itemized cost breakdown with labor, materials, equipment, and markup, schedule impact and revised completion date, attachments for drawings or photos, and signature fields for each approver. Add a running total — original contract sum, approved changes, new total — if you track the log in the same place.

Is this the same as an AIA G701 change order?

AIA G701 is the American Institute of Architects' standard change order document, licensed by AIA. This generator does not produce AIA-licensed paperwork — it builds your own request form that collects the same information: description of the change, adjustments to the contract sum and completion date, and the approval signatures. Many teams use a form like this for the request stage and issue the formal G701 once approved.

Can I collect an itemized cost breakdown?

Yes. Add separate fields for labor hours and rates, materials with quantities and unit prices, equipment, subcontractor costs, and a markup percentage. Structured number fields mean the pricing arrives itemized and reviewable instead of buried in an email.

Can the owner or client sign the change order electronically?

Yes. Add signature fields and approvers sign on screen from any device, alongside an approve-or-decline choice. The signature and timestamp are stored with the submission, so every change has a recorded approval. For which documents require particular signature formalities, follow your contract and local requirements.

How do I track cumulative changes against the contract value?

Send submissions to Google Sheets and keep a running change order log: each row carries the change order number, description, cost, schedule impact, and status. Totals against the original contract sum update as requests are approved — the same log the Excel templates promise, without re-typing each request.

Can subcontractors submit without a Makeform account?

Yes. Publish the form as a public link, embed it on your site, or send it by email or text — subs and clients submit from their phones, no login required, with photos attached from the job site.

Is this change order request form generator free?

Yes. You can generate the form, edit it, and publish it for free. Paid plans add higher submission volumes and advanced workflow features.

Stop doing extra work on a handshake.

Generate your change order request form and get every change approved in writing.

Free first draftCost and schedule fields built inSignatures on record
Explore form features